Premier Wen Jiabao proposed in the government work report that must try to speed up the economic development way transformation and the readjustment of the economic structure. The electric power as the energy transformation profession, this aspect’s duty is also very arduous, specially adjusts the optimized electric power energy structure, imminent. Must realize the non-fossil energy consumption to occupy the terminal energy consumption 15% goals, must develop the clean energy vigorously.
But the solar electrical energy generation, the wind power generation cost is very high, withstands with difficulty by our country present’s resident living standard, therefore, must develop the low cost water and electricity, the nuclear power vigorously.Our country water and electricity technology world is in the lead, water and electricity resources quite rich, but the present development is only 36%, the Western developed country water and electricity development has achieved 80%-90%, therefore, our water and electricity’s development potential is very big.
Archive for the ‘environment’ Category
Along with the high temperature weather which appears continually, the urban district date volume of diversion amounts to 2,860,000 cubic meters yesterday, since has been Beijing has the running water hundred year history highest record, already approached Beijing water furnishing ability limit. City water authority Bureau Chief Cheng Jing indicated in the morning that is studying whether needs to adopt the temporary limit water used to some professions the measure.The city running water group said that the city date volume of diversion reaches after July 4 2,680,000 cubic meters create this year new high, yesterday the urban district date volume of diversion amounts to 2,860,000 cubic meters, surpassed last summer 2,780,000 cubic meter historical highest date volume of diversion, also created in Beijing hundred year water supply history the maximum level, already close urban district daily water supply ability.
The statistical data demonstrated that yesterday was high when the volume of diversion appeared in 9:00 to 10:00, 1 hour volume of diversion amounted to 164,800 cubic meters.In order to guarantee the residential water used, the city running water group already started the contingency plans.
Action. In 2008, various law enforcement officers deployed across more than 160 million, more than 70 million times check the business, environmental law on the 15 000 businesses for investigation, supervise the handling of typical cases of more than 3,000 pieces of environmental law.
This year is China’s economic development since the new century, the most difficult year, environmental enforcement has
Significantly increased the difficulty and pressure. In response, Environmental Protection Minister Zhou Shengxian said that to further strengthen environmental law enforcement, Strict Management "two high and one capital" (high pollution, high energy consumption, resource consumptionbased) industry, carried out the iron and steel, special inspections related to arsenic in the industry; consolidation drinking water source protection area concentration and control the
Year. Bright "red card" without mercy to environmental protection in China is the key to optimizing the economic development period, although the COD discharge has been a downward trend, but the water pollution control in key river valleys is still long way to go.
Pollution Prevention Division Environmental Protection Department of the person in charge, the national statecontrolled sections of surface
Water, class V section of the current poor percentage of more than 1 4. Seven major river systems, the difference in the proportion of Grade V 50, worse than Grade V crosssection of more than 1 5. Lake eutrophication problems have become increasingly prominent, 28 key Lake (library), the water quality worse than Class 20, the main pollution indicators for
The total nitrogen and total phosphorus, some lakes and reservoirs and river water bloom occurred frequently, and even affect the to drinking water safety. Only increase the water pollution control law enforcement in order to inspire confidence, promote recuperation strategy. The past 5 years, the state carried out illegal sewage remediation company to protect public health and environmental protection special
Are in county and cities into more than one or a sewage treatment plant. For the protection of key water pollution control planning and implementation, the central government established the "three rivers and three lakes" and the Songhua River water pollution control special fund, in 2007, 2008, to arrange the "three rivers and three lakes", and 5 billion yuan of
Special funds Songhua River Basin . Last year, the State Council promulgated the 10 measures to expand domestic demand, increased central investment, which focus on water pollution prevention and control work on the key support. "Eleventh FiveYear" 3 years ago, the National Development Bank in the Huaihe River, Taihu Lake, the Three Gorges reservoir area and upstream river basin such
As 8 total loans 12.88 billion yuan to support the watershed pollution prevention. Monitoring data show that the first half of this year, compared to last year, seven major river systems increase the proportion of Grade 6.2 percentage points, the national statecontrolled sections of surface water, potassium permanganate index fell an average concentration of 14 over the same period last
Pre approval system, in 2008 refused to grant the province a total of 39 noncompliant projects. Jiangsu Taihu Lake has stopped approving new six key industries, changes, expansion, and other emissions of nitrogen, phosphorus and other pollutants. In Shandong Province in the South along the regional implementation of the COD emission standards, stricter than the 2008, 2.5 times the national
Standard, promoted industrial survival of the fittest.
Another Burden essence, is to accelerate the construction of pollution control projects, the production of industrial wastewater and domestic sewage discharge standards. As of the end of 2008, the Songhua River pollution control included 222 projects planned, completed 93, 42; in the construction of 117, accounting for 53, becoming the first expected to be
Completed one year ahead of "Eleventh FiveYear" pollution control project watersheds. Huaihe River Basin currently 230 cities and towns were built sewage treatment plants, the formation of a daily treatment capacity of about 9.18 million tons, an increase of 39 over 2007, adding a daily processing capacity of about 1.71 million tons, four provinces along the Huaihe River Basin area
As a mirror, can be positive development.
Pollution in the Liao River in Liaoning Province, the "iron determination, iron wrist and a heart of stone" on the province’s 417 full implementation of the papermaking enterprises stop production management, and pollution control facilities are incomplete and do not meet industrial policy making 269 paper companies implemented completely closed, and all without water,
Power, suspension of business license, remove the main production equipment. "Off", "stop", the entry threshold is even more to improve the environment, and strictly control new pollution sources. Songhua River Basin Provinces with regional industry organizations to develop distinctive local standards for discharge of industrial pollutants furfural. In 2008, Heilongjiang Province, with approval of the project were to return, suspend
The approval or rejection of 43 tubes and mediumsized province, accounting for 8.5 of the total number of approved projects. Environmental management in construction projects in Jilin Province on strict environmental access gateway, on the Songhua River to discharge pollutants from a class of all nonapproved projects, on the Songhua River chemical oxygen demand emissions new construction projects to implement
Jiangsu Province in the general promotion of "long river" system, convection within key rivers, municipal, county (district) as the main responsible person "Long River", coordination work to resolve the contradictions and problems, and promote pollutiondepth carried out. Pollution in Dianchi Lake in Yunnan Province, also began implementation of the "long river system", the river flows 82 Dianchi Lake and tributaries,
11 hung in each "long river," the name, hope that their strict inspectors, end of the year the achievement of all industrial wastewater, especially in rural areas sewage effluent is not discharged into the river of life.
Do not hold with pollution of the "golden child" of water pollution, problems in the water, roots on the shore. Shore of the industrial
Wastewater, domestic sewage, livestock manure, fertilizer, pesticides and other pollutants poured into the water, over water selfpurification capacity. Recuperate, we should strongly reduce the water burden, to reproduce the ecological balance. In 2007, Wuxi City, in one fell swoop close chemical manufacturer 775, 3 years 1 year to complete the task. Mayor Mao Xiaoping summed up as this: The lake
Dianchi Lake, Three Gorges Reservoir area and its upstream, middle and upper reaches of the Yellow River Basin Water Pollution Control Program and other key implementation was examined.
View from the valley, the Songhua River in Heilongjiang, Jilin, and Inner Mongolia, the Huaihe River Basin in Shandong, Henan, Anhui, Jiangsu provinces, Liaohe, Dianchi, Chaohu Lake Basin, have established the appropriate water
Pollution control responsibility. Responsibility down to every level, but also gave birth to a workable "long river system." Lake algae incident, Wuxi City, Jiangsu Province in August 2007 to implement water function area compliance of the "long river system", the city departments of party and government "in charge" as the 64 rivers were "long river", district, county and township ,
Large and small river inlet are also assigned to the "river long" for a river one policy, one by one treatment. "Long River," the pressure is able to fulfill their mission would be "onevote veto." "Long River" system one year, the city’s compliance rate of 79 sections on the assessment from 53.2 to 76.62. This year, the Huaihe River in
River"
May 2007, held in Harbin Songhua River water pollution control work meeting came news of the Songhua River Basin Water Pollution Control State has a strategic position to a higher and take a series of initiatives to further increase the pollution control efforts so that the Songhua River recuperate, to promote the sustainable development of the whole basin and the
Harmony and stability. This is the first time for the national water environment "respite." Its meaning is "to rivers and lakes with humane care, continue to reduce its pollution load, to restore the vitality of the ecosystem." In 2007, the former State Environmental Protection Administration under the State Council, all provincial governments and key watershed signed letters of responsibility for
Pollution reduction targets under the target assessment responsibility. In 2008, the State Council issued a special focus on water pollution prevention plan implementation of the Interim Measures for the Evaluation of the notification, the Environmental Protection Department in conjunction with relevant State Council departments, in the first half of the Huaihe River, Haihe River, Liaohe River, Taihu Lake, Chaohu Lake,